  • Visual inspection of hoist chains for excessive wear, twist, or distorted links that would interfere with proper function or stretch beyond the manufacturer’s recommendation.
  • Visual inspection of hooks for deformation or cracks.
  • Leakage or deterioration in lines, tanks, valves, drain pumps, and other parts of air or hydraulic systems.
  • The following items must be inspected as defined below:
  • The operator must not leave the controls of the hoist while it is suspendedĪ frequent inspection is an inspection that is performed daily to monthly intervals.
  • There will be no sudden acceleration or deceleration of the moving load.
  • The load shall be well secured and properly balanced in the lifting device before it is lifted more than a few inches.
  • The hoist chain or rope shall not be wrapped around the load.
  • The hoist chain or rope shall be free from kinks or twists.
  • crane lift safety plan report

  • The hoist shall not be loaded beyond its rated load capacity.
  • Only designated personnel will be allowed to operate overhead and gantry cranes.
  • General requirements for operating equipment.
  • Training will include but not be limited to:

    crane lift safety plan report

    Training will be provided to employees designated to operate overhead and gantry cranes.